S278 Agreement Highways Act

Work usually begins within four to six weeks of the agreement being signed. The time required to reach such an agreement should be long and the applicant should take this into account when programming his works. If the promoter does not make agreed payments or if the work is not carried out in accordance with the agreement, the motorway authority has the power to close access to the site. An S278 agreement generally includes one or more of the following agreements: A Section 278 (or S278) agreement is a section of Highway 1980 that allows developers to enter into a legal agreement with the Council (as the Road Authority) to make lasting modifications or improvements to a public highway as part of a plan. The procedure required to reach an agreement can take time and time, and it is therefore desirable to get in touch as soon as possible with the authority of the motorways. “A motorway authority can, if they are satisfied that it will be useful to the public, reach an agreement with each person – the agreement sets out the requirements applicable to both local road authorities and the developer to ensure that the proposed works are carried out in accordance with the approved designs. It also explains how local road authorities can act if the developer is unable to complete the work. The agreement between the motorway authority and the developer is called the agreement section 278 and can be used articles such as: If the developer concludes the agreement to provide work instead of simply contributing to other work, they will be responsible for the design of the work to the satisfaction of the Council. Although the Council is involved throughout the discussion of the plans and their timing with the developing parties, the final decision is to continue with a program and reach an agreement, that of the developer, and the Commission has no control over it.

In many of our works, you will often find reflection point 278 (or S278). Conditions for the person to pay all or part of the cost of the work that can be fixed or fixed in accordance with the agreement. To obtain these improvements, the proponent must obtain permission from the highway authority for detailed work planning and reach an agreement defining how the work should be delivered. An S278 contract is used for a long time to enable the development of the existing road network. However, it can also be used to improve the motorway network needed by development or to contribute to future work on the wider network of motorways. In Birmingham, we normally use s278 agreements to allow designers to employ a contractor in road construction and for that contractor to work on the existing public highway, as we, the motorway authority, would carry out work. The proponent is responsible for all aspects of the public highway work, from planning to monitoring the construction and ensuring that the work is completed to our satisfaction.

Posted in Uncategorized